Our Transformer Relocation Process
1. Consultation and Site Survey The first step in relocating a national power transformer is understanding the project’s full scope. Our team will visit the current site and the new location to assess the space, access points, and any logistical challenges. We take the time to thoroughly evaluate your needs and determine the best approach for the move.
2. Detailed Planning and Coordination Every transformer move requires careful planning. Our experts create a detailed relocation plan that includes transport routes, timing schedules, equipment needs, and risk management protocols. We also coordinate with local authorities, ensuring that the move complies with all regulatory requirements and safety standards.
3. Transformer Rigging and Loading When the day of the move arrives, our team will carefully rig and load your transformer onto our specialised vehicles. Using advanced lifting techniques and high-quality rigging gear, we ensure that the equipment is securely fastened and protected during transit.
4. Secure Transport Machinemove Ltd’s fleet of vehicles is equipped to handle the challenges of transporting heavy, oversized loads. Our drivers are experienced in navigating the most efficient and safest routes, whether across short distances or nationwide. Every move is monitored, ensuring your transformer arrives on schedule and in perfect condition.
5. Unloading, Installation, and Set-Up Upon arrival at the new location, our team will carefully unload and position the transformer. We ensure that all safety protocols are followed during installation and that the equipment is set up correctly for optimal performance. Once the transformer is in place, we verify that everything is operational and ready to be integrated into the power grid.
Industries We Serve
- Energy & Utilities
- Electricity Distribution Networks
- Renewable Energy
- Industrial Power Supply
- Infrastructure Projects